projects

TURBINE FAILURE RCA IVORY COAST

Project Owner

AZITO ENERGIE

EPC

GRUPO COBRA

Client

GRUPO COBRA

Project Scope

CONSTRUCTION OF AZITO IV POWER GENERATION TERMINAL

Sector

POWER GENERATION

Design Standard

-

Total Storage Capacity

300 MW

Project State

RCA

Type of Service

TECHNICAL

Country

IVORY COAST

Period

2024

MIG BRAZING WELDING JAPAN

Project Owner

RENOVA INC

EPC

GRUPO COBRA

Client

GRUPO COBRA

Project Scope

RCA OF MIG-BRAZING WELD FAILURE

Sector

POWER GENERATION

Design Standard

-

Total Storage Capacity

-

Project State

RCA

Type of Service

TECHNICAL

Country

JAPAN

Period

2023

TERMINAL BAHIA LAS MINAS

Project Owner

VOPAK

EPC

-

Client

VOPAK

Project Scope

LONG-TERM HYDROSTATIC TEST, CORROSION TECHNICAL REPORT

Sector

FUEL TERMINAL

Design Standard

API 650

Total Storage Capacity

100.000 M3

Project State

CONSTRUCTION

Type of Service

TECHNICAL REPORT CORROSION

Country

PANAMA

Period

2018

FLUXYS ZEEBRUGGE LNG TERMINAL

Project Owner

FLUXYS

EPC

FELGUERA - IHI

Client

FELGUERA - IHI

Project Scope

ANALYSIS OF DEFORMATIONS IN THERMAL CORNER PROTECTION

Sector

LNG PLANT

Design Standard

API 620

Total Storage Capacity

180.000 M3

Project State

EPC

Type of Service

TECHNICAL REPORT

Country

BELGIUM

Period

2018

CRESCENT DUNES SOLAR THERMAL POWER PLANT

Project Owner

TONOPAH SOLAR ENERGY

EPC

ACS - COBRA

Client

COBRA THERMOSOLAR PLANTS, INC

Project Scope

HOT SALTS TANK FAILURE, ROOT-CAUSE METALLURGICAL REPORT

Sector

THERMOSOLAR PLANT

Design Standard

API 620

Total Storage Capacity

16.200 M3

Project State

REPARATION

Type of Service

TECHNICAL REPORT

Country

USA

Period

Since: 2016 Until: 2017